Loker PT Pertamina Geothermal Energy Terbaru

sumber gambar : www.google.com

Profile Of PT Pertamina Geothermal Energy (PGE)

Latest jobs Pertamina Geothermal Energy –Geothermal Pertamina Energy (PGE), a subsidiary of PTPertamina (Persero), founded in 2006, has beenmandated by the Government to develop Geothermalconcessions of the working area 14 in Indonesia.Companies that provide energy without polluting it, 90% of its shares owned by PT Pertamina (Persero) and 10% dimiliiki by Venture Funds of PT Pertamina.

New Era for geothermal energy begins with the inauguration of the Geothermal Field of kamojang on January 29, 1983 and followed by the operation of thepower plant Panasbumi (PLTP) Unit-1 (30MW) onFebruary 7, 1983, and five years later the two unitsoperates with a capacity of 55 MW each. On Sumatra island for the first time operate in MW 2 MonoblokSibayak Brastagi-as the first Power Plant and in August 2001 the first PLTP 20 MW Lahendong area to operate in.

Along with the passage of time the Government through Presidential Decree No. No. 76/2000 repealearlier Issued and enacted Act No. 27/2003 of PT Pertamina geothermal, which no longer has a monopoly in the business of geothermal energy, butsam with businessmen and other geothermal inIndonesia.

In implementing the legislation restores the Pertamina had 16 working area (WKP) Geothermal Concessionsto Governments of the 31 WKP given to managed.

On 23 November 2001 the Government enacted aLAW on OIL & GAS No. 22/2001 on the management of oil and gas industries in Indonesia.This ACT of memjbawa a very large change for the oil and gas sector, including Pertamina. After theenactment of the LAW has the same position Pertamina with the oil and gas business and otheractors. On September 17, 2003 PERTAMINA changedshape into PT Pertamina (Persero) and throughGovernment Regulation (PP) No. 31/2003 mandatedto divert effort geothermal which is managed by PT Pertamina Lo transferred to Subsidiaries at the latesttwo years after the company was formed. For that PT Pertamina Pertamina Geothermal Energy form (PTPGE) as a subsidiary company which will manage the business activities in the field of geothermal.

1974 – geothermal exploration and exploitationActivities in Indonesia has been initiated by PT Pertamina (Persero).

1982 – operation of PLTP Unit electric generatingKamojang I of 30 MW.

1983 – appointment of Kamojang geothermal field attangggal, January 29, 1983.

2006 – PT Pertamina Geothermal Energy (PGE) standsas a subsidiary company of PT Pertamina (Persero) andPT Pertamina Venture Funds. PGE was established based on deed of Establishment No. 10 dated December 12, 2006 and has received the endorsement of Minister of Law and human rights Republic & Indonesia by Decree number W7-00089 HT.-01: 01st. 2007 dated January 3, 2007.

2012 – PT Pertamina Geothermal Energy (PGE) areaUlubelu commercially ready for operation with a totalcapacity of 2 × 55 MW. The Area was officially inaugurated by the President of the REPUBLIC on 6 December 2012.

Source pertamina.com


Lowongan Kerja PT Pertamina Geothermal Energy Terbaru


Update 27 Oktober 2014
POSISI : Asisten HSE Manager (K3LL / 01)
Persyaratan
  • Pendidikan minimal (S1).
  • Jurusan Teknik, Lingkungan, K3.

Kemampuan dan kompetisi :
  • Faham tentang Sistem Manajemen Lingkungan dan OHSAS.
  • Mempunyai basic Risk Assessment.
  • Lancar berbahasa Inggris (lisan maupun tulisan), dengan skor TOEFL minimal 500.
  • Mempunyai pengalaman kerja minimal 10 tahun di bidang Kesehatan dan Keselamatan Geothermal, Minyak dan Gas, proyek energi lainnya.
Lowongan kerja untuk penempatan diwilayah seperti dibawah ini :
  • Karaha Project, Tasikmalaya – Provinsi Jawa Barat.
  • Lumut Balai Proyek, Muara Enim – Propinsi Sumatera Selatan.
Status Pekerjaan :
  • Karyawan Kontrak Waktu Tertentu (KKWT).


POSISI : Safety Engineer ( K3LL/02 )
Persyaratan
  • Pendidikan minimal (S1).
  • Jurusan Teknik, Lingkungan, K3.

Kemampuan dan kompetisi :
  • Faham tentang Sistem Manajemen Lingkungan dan OHSAS.
  • Mempunyai basic Risk Assessment.
  • Lancar berbahasa Inggris (lisan maupun tulisan), dengan skor TOEFL minimal 500.
  • Mempunyai pengalaman kerja minimal 10 tahun di bidang Kesehatan dan Keselamatan Geothermal, Minyak dan Gas, proyek energi lainnya.
Lowongan kerja untuk penempatan diwilayah seperti dibawah ini :
  • Lahendong Proyek Minahasa, Provinsi Sulawesi Utara.
  • Kamojang Project, Garut – Provinsi Jawa Barat.
Status Pekerjaan :
  • Karyawan Kontrak Waktu Tertentu (KKWT).


Date line tanggal 02 November 2014.  Segera kirim aplikasi lamaran kerja anda lengkap ke alamat website kami secara online dialamat http://recruitment.pertamina.com.  Hanya kandidat terpilih yang akan diproses lebih lanjut.
Judul: Loker PT Pertamina Geothermal Energy Terbaru; Ditulis oleh Unknown; Rating Blog: 5 dari 5

0 Response to "Loker PT Pertamina Geothermal Energy Terbaru"

Post a Comment

Related Posts Plugin for WordPress, Blogger...